Metallic Processing Machinery

Metal Deck Roll Forming Machine

Zhangjiagang City Saibo Science & Technology Co., Ltd.
  • Type:Rolling Machine
  • Forging Forming Method:Roll Forming
  • Power Source:Electric
  • Feature:High Efficiency
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:YX76.2-300-900
  • Customized:Customized
  • Advantage:Use Widely
  • Condition:New
  • Color:Blue and Yellow
  • Transport Package:Film Covering
  • Specification:CE SGS
  • Trademark:SAIBO
  • Origin:Jiangsu, China
  • HS Code:84552210
  • Production Capacity:300sets,Year

Description

Item NO 
Description 
Offered specification Roll Forming MachineYX63.5-317-950 Rolling Speed12-15m/min(not include cutting time)
  Rolling Thickness0.8-1.5mm GI Control SystemPLC  (Panasonic) as list in the note Un Coiler5 ton manual de-coiler Roller StationsAbout 27 stations Roller Material45# forge steel, coated with chrome Shaft Material and DIA¢85mm, material is 45# forge steel Maim Motor Power22kw (two 11KW) Hydraulic Station Power5.5kw Hydraulic Pressure20Mpa Material Of CuttingCr12Mov quenching 58-62ºC Material Of The StationsCast iron Tolerance3m+-1.5mm Electric Source380V, 50HZ,3 phase
Also can satisfy customer's require Way Of Drive1.2 inch double chain Color Of The MachineYellow and blue Size of the machineL*W*H   around 17m*1.7m*1.6m Container Need1x40 feet

4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation

5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!