Metallic Processing Machinery

EPS and Rock Wool Sandwich Line

Zhangjiagang City Saibo Science & Technology Co., Ltd.
  • Color:Customized
  • Type:Rolling Machine
  • Transport Package:Sea Packing
  • Specification:CE SGS
  • Trademark:SAIBO
  • Origin:China

Base Info

  • HS Code:84552210
  • Production Capacity:200 Set,Year

Description

Basic Info.

HS Code 84552210 Production Capacity 200 Set/Year

Product Description

1. The list of the product line consists of components and the technical data of the product line:
NO.Composing of product line:Amount 
1Two sets of Uncoiler 2
2Steel sheet transverse cutting device,steel sheet surface PVC film covering device 2
3Roll forming machine(4 sets) and platform(up and down)  
4Conveyer rack 1
5Pre-heating room 1
6PU two components Liquid mixing and injecting section for foaming  made in Italy1
 
7Double belt machine(caterpillar) include lift  control system and 6 sets side nylon seal blocks, one set bottom nylon seal blocks to make roof panel 1
8Heating and heat insulation system 1
9Panel automatically cutting system 1
10Conveyer, automatic stacking machine and packing machine1
11Electric control system 1
   

3.This product line could make three kinds of sandwich panel:

  1. EPS and Rock Wool Sandwich LineEPS and Rock Wool Sandwich Line
4. Packing & Delivery
  1. Deliver time: take goods after receive deposit 200 days
  2. Packing: suitable of ocean transportation
5. Warranty
  1. Warranty: 1 year warranty from date of shipment
  2. Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment