
China Manufactures Aluminum Metal Roofing Sheet Hydraulic Tile Roll Forming Press Machine Factory Price with ISO9001/Ce/SGS/Soncap
Hangzhou Zhongyuan Machinery Factory- Type:Hydraulic Press Tile Roll Forming Machine
- Forging Forming Method:Cold Roll Forming
- Power Source:Electric
- Feature:Automation
- Certification:ISO9001, CE, SGS, BV, Ce, ISO
- Warranty:12 Months
Base Info
- Model NO.:Roof Tile Roll Forming Machine
- Customized:Customized
- Advantage:Use Widely
- Condition:New
- Main Power:5.5kw
- Shafts for Rollers:Grand Twice, ID72mm Solid Steel
- Rollers Material:No.45 Forged Steel with Hard Chrome
- Cutter Material:Cr12 Mould Steel with Heat Treatment
- Machines Weight:About 9000kgs
- Controlling System:Mitsubishi PLC & Converter
- Operation Language:English or as Per Client`S Required
- Guarantee Time:First Year Free, Lifetime Services
- Transport Package:Suitable for Sea Transport
- Specification:CE SGS BV
- Trademark:Zhongyuan
- Origin:China
- HS Code:84552210
- Production Capacity:10 Sets,Month
Description
ItemSpecification
Material Type Pre-painted steel coil & galvanized coils Thickness(mm) 0.5-0.6 Yield strength(mpa) 235-345 Roller material 45#Chrome steel Forming speed(m/min) About 15-20 Output speed(m/min) 5-6 Speed adjusting mode AC Frequency Roller drive Decelerating motor + Chain drive Cutting mode Hydraulic cutting Cutter material Cr12 mould steel Length measurement Encoder Control mode Mitsubishi PLC Operating mode Button + Mitsubishi Touch screen Main motor power(kw) 5.5KW Total power(kw) 11KW
Components of machineDecoiler1set Feeding & guiding device 1set Main roll forming machine 1set Hydraulic pressing system 1set Hydraulic cutting system 1set Controlling system 1set Run out table 1set
Process flow
Decoiler -- Feeding & Guiding -- Roll forming--Hydraulic pressing - Hydraulic Cutting - product to run out table
Packing:
1. One 40feet container for loading one set tile formign machine with mechanical decoiler.
2. Main formiong machine body and decoiler is load naked (tighten to container with steel wire rope).
3. Spare parts and operating tools are loading in tooling box.
Delivery:
about 70 days after received advaced payment
We customize your machines!
To customize machine, we would love to know:
1. Profile drawing
2. Raw material: the width(1250mm?), thickness(0.3-0.7mm?), and yield strength of steel coil.
3. Voltage: designed per your requirement
4. Configuration requirement: Hydraulic or manual decoiler/ stacker
Have no idea about them?
We will be glad to recommend the lacol popular profile for you----Just let us know your country!

Why us?
1. Customize roll forming machines since 2003.
2. Capacity: 12-15 sets/month
3. Delivery: in only 5-8 weeks for urgent order
4. Company occupies 6650, in which 5650 for workshops
5. Have our own tool center. 12 sets CNC machines.
6. Technician can be sent to your factory to install the machine and train your workers

Material
Components of machineDecoiler
Process flow
Decoiler -- Feeding & Guiding -- Roll forming--Hydraulic pressing - Hydraulic Cutting - product to run out table
Packing:
1. One 40feet container for loading one set tile formign machine with mechanical decoiler.
2. Main formiong machine body and decoiler is load naked (tighten to container with steel wire rope).
3. Spare parts and operating tools are loading in tooling box.
Delivery:
about 70 days after received advaced payment
We customize your machines!
To customize machine, we would love to know:
1. Profile drawing
2. Raw material: the width(1250mm?), thickness(0.3-0.7mm?), and yield strength of steel coil.
3. Voltage: designed per your requirement
4. Configuration requirement: Hydraulic or manual decoiler/ stacker
Have no idea about them?
We will be glad to recommend the lacol popular profile for you----Just let us know your country!

Why us?
1. Customize roll forming machines since 2003.
2. Capacity: 12-15 sets/month
3. Delivery: in only 5-8 weeks for urgent order
4. Company occupies 6650, in which 5650 for workshops
5. Have our own tool center. 12 sets CNC machines.
6. Technician can be sent to your factory to install the machine and train your workers
