Metallic Processing Machinery

Steel Roof Cold Roll Forming Machine

Hangzhou Zhongyuan Machinery Factory
  • Type:Rolling Machine
  • Forging Forming Method:Cold Roll Forming
  • Power Source:Hydraulic Pressure
  • Feature:High Efficiency
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:ZYYX
  • Customized:Customized
  • Advantage:Easy to Maintenance
  • Condition:New
  • Size:11*1.6*1.5m
  • Machines Weight:About 9t
  • Operation Language:English or as Per Client`S Required
  • Cutter Material:Cr12 Mould Steel Being Quenched Treatment
  • Guarantee Time:First Year Free, Lifetime Services
  • Rollers Material:No.45 Forged Steel, Plated with Hard Chrom
  • Cutting Style:Cut to Length
  • Certificate:CE
  • Quality System:ISO9001
  • Control System:Mitsubishi PLC System
  • Transport Package:40gp Container for One Machine
  • Specification:CE SGS BV
  • Trademark:zhongyuan
  • Origin:China
  • HS Code:84552210
  • Production Capacity:10sets,Month

Description


                      
Technical parameterItemSpecificationRaw MaterialTypePre-painted steel coil & galvanized coilsThickness(mm)0.4-0.7Yield strength(mpa)235Roller material45# steel , coated with ChromeShaft for rollers Solid shaft with 72mm,processed with cylindrical grinderForming speed(m/min)About 15-20Output speed(m/min)About 12Speed adjusting modeMitsubishi frequency transformerRoller drive                                               Decelerating motor + Chain driveCutting modeHydraulic cuttingCutter material Cr12 mould steelLength measurementNemicon EncoderControl modeMitsubishi PLCOperating modeButton + Mitsubishi Touch screenMain motor power(kw)5.5KW Total power(kw)7.7KW 

Components of machineDecoiler (manual decoiler and hydraulic decoiler for option)1set  Feeding & guiding device1setMain roll forming machine1setHydraulic cutting system1setControlling system1setRun out table (auto. Stacker for option)1set  


Process flow:
Decoiler -- Feeding & Guiding -- Roll Forming-- Hydraulic Cutting - Product to Run Out Table



Packing:
1. One 40feet container for loading one set machine with mechanical decoiler. 
2. Main machine body and decoiler is load naked (tighten to container with steel wire rope). 
3. Spare parts and operating tools are loading in tooling box.
 
Delivery : about 50 days after received advaced payment