Metallic Processing Machinery

Fast Speed Double Layer Roll Forming Machine

Zhangjiagang City Saibo Science & Technology Co., Ltd.
  • Type:Rolling Machine
  • Forging Forming Method:Roll Forming
  • Power Source:Electric
  • Feature:High Efficiency
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:YX18-136.7-1093.6 & YX40-193-965
  • Customized:Customized
  • Advantage:Use Widely
  • Condition:New
  • Name:Fast Speed Double Layer Roll Forming Machine
  • Color:Blue and Yellow
  • Transport Package:Sea Packing
  • Trademark:Saibo
  • Origin:Jiangsu
  • HS Code:84552210
  • Production Capacity:300sets,Year

Description

Item NO 
Description 
Offered specification Roll Forming MachineYX18-136.7-1093.6
YX40-193-965
  Coil widthAccording the profile Rolling Speed15-30m/min(not include cutting time) Rolling Thickness0.3-0.8mm GI or PPGI up to 235Mpa Control SystemPLC  (Siemens) as list in the note Un Coiler5T hydraulic decoiler Roller StationsUpper:About 20 stations
Down: about 22 stations Roller Material45# forge steel, coated with chrome Shaft Material and DIA¢70mm, material is 45# forge steel Post cuttingHydraulic cutting after forming Maim Motor Power11kw Hydraulic Station Power5.5kw Hydraulic Pressure12-16Mpa adjustable Material Of CuttingCr12Mov quenching 58-62ºC Material Of The StationsWall panel Tolerance3m+-1.5mm Electric Source380V, 60HZ,3 phase
According to customer's require
  Way Of DriveBy chain Color Of The MachineYellow and blue Size of the machineL*W*H   about11m*1.5m*1.2m Container Need1x40 feet +1x20 feet
4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation

5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!