
Monthly Deals Automatic Color Steel Simple Cut to Length Line Steel Leveling Line/Re-Coiling Line/Pre-Leveling/Slitting/Shearing Line
XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.- After-sales Service:1 Year Warranty
- Type:Pre-Leveling,Slitting,Shearing Line
- Drive Mode:CNC
- Warranty:1 Year
- Thickness:0.4-1.5
- Strength:350MPa
Base Info
- Model NO.:Shearing machine
- Transport Package:20gp*1
- Specification:4T
- Trademark:LIMING MACHINERY
- Origin:Fujian, China (Mainland)
- Production Capacity:600
Description
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. After-Sale Service In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Terms Of Trade
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before
the machine be send out of factory.