Metallic Processing Machinery

Roofing Tiles Building Material Roll Forming Machine

Zhangjiagang City Saibo Science & Technology Co., Ltd.
  • Type:Rolling Machine
  • Forging Forming Method:Mold Forging
  • Power Source:Hydraulic Pressure
  • Feature:High Efficiency
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:YX65-187.5-750
  • Customized:Customized
  • Advantage:Use Widely
  • Condition:New
  • Color:Blue and Yellow
  • Speed:30m,Min
  • Transport Package:Suitable for Sea Packing
  • Specification:CE, SGS
  • Trademark:SAIBO
  • Origin:Jiangsu, China
  • HS Code:84552210
  • Production Capacity:300sets,Year

Description

Specification of the material1
 Suitable MaterialColored Steel plate, Galvanized steel2
 Width of the raw material1219mm3Thickness0.4-0.8mmMachine Detailed Parameters:
 
1Machine structureCast iron structure
2Total powerAbout 35KW
3Roller stationsAbout 23stations
4Productivity0-30m/min
5Drive systemBy gear box
6Diameter of shaft¢85mm solid shaft
7
 
Voltage380V 60Hz 3phases 

3. The Chart of Process Flow
Roofing Tiles Building Material Roll Forming Machine4. Packing & Delivery
  1. Deliver time: take goods after receive deposit 60 days
  2. Packing: suitable of ocean transportation
5. Warranty
  1. Warranty: 1 year warranty from date of shipment
  2. Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment