Slitter and Cutting Machine
Zhangjiagang City Saibo Science & Technology Co., Ltd.- Type:Shearing Machine
- Forging Forming Method:Roll Forming
- Power Source:Hydraulic Pressure
- Feature:High Efficiency
- Certification:ISO9001, CE
- Warranty:12 Months
Base Info
- Customized:Customized
- Advantage:Easy to Maintenance
- Condition:New
- Color:Blue and Yellow
- Transport Package:Sea Packing
- Specification:CE SGS
- Trademark:SAIBO
- Origin:China
- HS Code:84552210
- Production Capacity:300set,Year
Description
Basic Info.
Customized Customized Advantage Easy to Maintenance Condition New Color Blue and Yellow Transport Package Sea Packing Specification CE SGS Trademark SAIBO Origin China HS Code 84552210 Production Capacity 300set/YearProduct Description
1. Slitting LineThe line includes in decoiler, guiding device, slitting device, cutting device, length measure device, extension device, recoiler, coil car, hydraulic station, PLC controlling system
2. Technical Parameters
Item NO | Description | Offered specification | Customer require specification |
Cut to Length and Slitting Line | 1250mm | ||
Speed | 0-60m/min | ||
Rolling thickness(Max) | 0.5-2.0mm | ||
Control system | PLC (Panasonic) as list in the note | ||
Un coiler | 10TON hydraulic de-coiler | ||
The material width | 1250mm | ||
Feeding power | By servo motor. 2.9KW | ||
Cutting power | 11kw | ||
Slitting shaft diameter | 100mm | ||
Slitting blade | 6 pieces | ||
Slitting blade material | Cr12 with heat treatment | ||
Electric Source | 480V, 60HZ,3 phase | ||
Color of the machine | Yellow and blue |
3. Simple photo
4. Packing & Delivery
- Deliver time: take goods after receive deposit 60 days
- Packing: suitable of ocean transportation
- Warranty: 1 year warranty from date of shipment
- Guarantee:
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
6. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment