Metallic Processing Machinery

Custom CNC Machinery Parts by CNC Lathe

Jiangsu HYT International Trading Co., Ltd.
  • Standard:DIN, ASTM, GB, JIS, ANSI
  • Customized:Customized

Base Info

  • Transport Package:Snakeskin Bag,Wooden Carton
  • Trademark:HYT
  • Origin:China
  • Production Capacity:600000 Tons Per Year

Description

 
SizeCustomized, OEM
Tolerance± 0.01mm
Materialiron, aluminum, steel, stainless steel   brass/copper, zinc    plastic, acrylic   carbon steel, nylon, bronze, solder alloy, HSS, POM  tool steels, or customized
1. Stainless Steel: SS201, SS303, SS304, SS316 etc.
2. Carbon Steel: AISI 1045, 9SMnPb28 etc
3. Brass:C36000 (C26800), C37700 (HPb59), C38500(HPb58), C27200(CuZn37), C28000(CuZn40) etc.
4. Bronze: C51000, C52100, C54400, etc.
5. Iron: grey iron and ductile iron
6. Aluminum: 6061, 6063,7075,5052 etc.
Surface treatment:Heat treatment, polishing, PVD/CVD coating, galvanized, electroplating, spraying, and painting oxidation and other chemical handlings 
Processing equipment: CNC machining center, CNC lathe, grinding machine, automatic lathe machine, conventional lathe machine, milling machine, drilling machine, EDM, wire-cutting machine, and CNC bending machine
Processing Methodcnc machining, turning, milling, drilling, grinding, broaching, welding and assembly.
CertificationISO9001
ApplicationCar, medical, carrier, ship, excavator, Automation machine, medical device, industrial machine, automobile, and electric appliance
etc
Drawing formatPRO/E,CAD,Solid Works,IGS,UG,CAM,CAE
ServiceAccording to customer requirements, provides production design, production and technical service, mold development, and processing to offer one-stop service.
Delivery Time7~30 Days
PackingEPE foam / rust proof paper / stretch film / plastic bag + carton
Minimum order quantity:Negotiable



Equipment:
Custom CNC Machinery Parts by CNC Lathe



Testing Lab:
Custom CNC Machinery Parts by CNC Lathe



Qualification:

Custom CNC Machinery Parts by CNC Lathe

FAQ:1)Are you manufacturer or trading company? 
We are manufacturer.
2) Where is your factory?
We are a group, in order to meet different demands from our customers, we had developed many subsidiary corporations in Shandong, Tianjin, Hebei,Jiangsu and Shanghai.
3) What's the delivery time?
If we have inventory, it is 3-7 days
Generally speaking, it's around 15 days from the date of receiving payment.

If there any more question, please feel free to contact the sales without any hesitate.