Metallic Processing Machinery

Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)

Tengzhou Uni-Tech Co., Ltd.
  • Type:Shear Brake Roll Machine
  • Forging Forming Method:Free Forging
  • Power Source:Hand
  • Feature:Precision
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:3-IN-1,1320X1.5
  • Customized:Non-Customized
  • Advantage:Simple Structure
  • Condition:New
  • 3-in-1/1320X1.5:Factory Supply Muti-Purpose Metal Shear Brake Roll
  • Bed Width:1320mm
  • Shearing Thickness:1.5mm
  • Bending Thickness:1.5mm
  • Bending Angle:90°
  • Rolling Thickness:1.5mm
  • Min Rolling Dia.:60mm
  • Packing Size:179X59X93cm
  • N.W./G.W.:470,530kgs
  • Brand:China Brand Uni-Tech
  • Transport Package:Wood Case
  • Specification:size: 179x59x93cm
  • Trademark:UNI-TECH
  • Origin:Shangdong, China
  • HS Code:84622990
  • Production Capacity:300 Sets

Description

Model3-IN-1/1067X1.53-IN-1/1320X1.5Bed width(mm)10671032Shearing Thickness(mm)1.51.5Bending Thickness(mm)1.51.5Bending Angle 90° 90°Rolling Thickness(mm)1.51.5Min Rolling Dia (mm)6276Packing size(mm)154X61X90183X61X97N.W./G.W.(kg)390/440470/530Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)

Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)

Detailed pictures:
Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)
Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)Factory Supply Muti-Purpose Metal Shear Brake Roll Combined Machine (3-IN-1/1320X1.5)
Optional accessories of our 3-IN-1/1320x1.5:
1.Stand

Warranty:

What about the spare part if the machine break down? 

==about the machine break down, normally our policy will be as the under way
   1) Our quality guarantee time is 12 months since the machine on board 
   2) During this period, if the machine break down owing our machine itself quality problem,  we will prepare the spare parts and send to you by free within 5 days. all these will be by free. 
  3) If the break down is caused by the mis operation,  we of course will supply you the spare parts, but we have to charge you the costs prices.