Metallic Processing Machinery

Double Layer Steel Profile Roll Forming Machine

Hangzhou Zhongyuan Machinery Factory
  • Type:Rolling Machine
  • Forging Forming Method:Cold Roll Forming
  • Power Source:Electric
  • Feature:Automation
  • Certification:ISO9001, CE
  • Warranty:12 Months

Base Info

  • Model NO.:ZYYX Series
  • Customized:Customized
  • Advantage:Use Widely
  • Condition:New
  • Certificate:CE
  • Machine Size:8.5 *2 *1.45 M
  • Main Motor:About 7.5kw
  • Delivery Time:About 60days
  • Operation Language:English or as Per Client`S Required
  • Guarantee Time:First Year Free, Lifetime Services
  • Rollers Material:No.45 Forged Steel, Plated with Hard Chrom
  • Controlling System:Mitsubishi PLC & Converter
  • Quality System:ISO9001
  • Cutter Material:Cr12 Mould Steel Being Quenched Treatment
  • Transport Package:1X40gp Container for One Machine
  • Specification:CE SGS BV
  • Trademark:zhongyuan
  • Origin:China
  • HS Code:84552210
  • Production Capacity:10sets,Month

Description

Machine`s sizeAbout 8.5 *2 *1.45 m (Depend on final design)

ComponentsDecoiler 
(manual/ hydraulic decoiler for option)
1set  Feeding & guiding device2setMain roll forming machine2setHydraulic cutting system1set (2 blades)Controlling system1setRun out table (auto. Stacker for option)1.5m/ pc, 2 pcs

Layout drawing                                                                          

Double Layer Steel Profile Roll Forming Machine

Our Certificate                                                                            

Double Layer Steel Profile Roll Forming Machine

FAQ                                                                                             


Q1:When your factory extablished? 
A1: We extablished since 2003, team with engineers who have 20 years experience in metal forming machine industry. We produce machine all-in-house, from raw material to ready machine, all done in our factory, so that we can control our machine quality and delivery time. 


Q2:How long does it take to deliver the machine after the order & deposit?
A2:Usually it will take 50-60 working days to manufacture the machine and make it ready to deliver. At first 15 days the technical drawing will be made. The second 25 days start manufacturing the parts and ready to assemble. In the last 20 days the machine will be assembled and inspected to make sure it is ready to deliver.

Q3:What is your warranty term?
A3:Machine warranty time is 12 months. We supply life time service for our produced machines for all customers. 

Q4:Can you offer oversea service?
A4:Yes,we have experienced technicians who can be sent to different countries to install our machines and supply others service .