Metallic Processing Machinery

Precision CNC Milling Machining Rapid Prototype Development Service

HK AA Industrial Co., Limited
  • Condition:New
  • Certification:RoHS, ISO9001, Ts16949
  • Standard:DIN, ASTM, GB, ANSI
  • Customized:Customized
  • Material:Stainless Steel
  • Application:Metal Recycling Machine, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal Engraving Machinery

Base Info

  • Model NO.:hkaa-336
  • Descriptions:Milling Machining Rapid Prototype
  • Tolerance:+,-0.05mm
  • Delivery Time:25 Days
  • Certificate:ISO9001,Ts16949
  • MOQ:10PCS
  • Transport Package:Polybag+Carton
  • Specification:custom
  • Trademark:custom made
  • Origin:China
  • HS Code:7326901000
  • Production Capacity:600PCS,Month

Description

Industry Focus

Appliance/ Automotive/ Agricultural

Electronics/ Industrial/ Marine

Mining/ Hydraulics/ Valves

Oil and Gas/ Electrical/ Construction

Intended Application

Shafts; Valve Components;

 Automatic Door Components

Cable/ Electronic Connector

Fire Suppression System Components

Fittings/ Fasteners; Gears/ Hardware; 

Roller Bearings

Lead Times Available

 

Max: 2 Weeks (On Initial Order)

Rush Services Available

Industry Standards

ISO 9001:2008;  PPAP

RoHS Compliant

Additional Capabilities

CAD Design Services; CAM Programming Services

Coordinate Measuring Machines (CMM)

Reverse Engineering

Equipment List

From simple 2-axis turning to 7-axis, 

turn-mill-drill CNC Swiss-type machines,

molding machines/ stamping machines

automatic lathe machines/ spring machines.

Material 

(Metals or plastic)

Alloy Steels/ Aluminum/ Brass/ Bronze Alloys

Carbon Steel/ Copper/ Stainless Steel/ Tool Steel

Cold Rolled Steel/ Bearing Steel

ABS/ Delrin/ Nylon/ PVC

Testing equipment

Projector. Calliper,  micrometer, plug gauge, ring gauge, thread gauge

Processes

(Special Capabilities)

Broaching/ Hobbing/ Slotting/tapping

Tolerance

±0.0002 in; ±0.0051 mm

packing

For light objects: 

bubble pack individually to prevent from damaging 

and scratches in transporting, then in carton; 

for heavy objects: 

wrapped in PE bags and then in wooden boxes

Precision CNC Milling Machining Rapid Prototype Development Service
Precision CNC Milling Machining Rapid Prototype Development Service

Shipping 

 


1. We are willing to provide with sample for quality and function testing.2.  Delivery time:within 20 working days .

 

FAQ

 

Q1:How to guarantee the Quality of Industrial Parts?

A1:we are ISO 9001-2008 certified firm. we have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.

 

Q2:What's the Advantage of Your Parts for Industry Products?

A2:Our advantage is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. our Industrial parts products are featured by strict tolerance, smooth finish and long-life performance.

 

Q3:what are our machining equipmengts?

A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping 

machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines, 

screw machines, cutting machines and so on.

 

Q4: What shipping ways our use?

A4:Generally speaking, we will use UPS or DHL to ship the products. Our customers can reach the 

products within 3 days.
If our customers do not need them urgently, we will also use Fedex and TNT.
If the products are of heavy weight and large volumn, we will ship them by sea. This way can save 

our customers a lot of money. 

 

Q5:Who are our main customers?

 

A5:HP, Samsung, Jabil Group,Lexmark,Flextronic Group. 

 

Q6:What materials can you handle?

A6:Brass,bronze,copper,stainless steel, steel,aluminum,titanium And plastic.

 

Q7:How Long is the Delivery for Your Industrial Part? 

A7:Generally speaking, it will take us 15 working days for machining parts and 25 working days for 

the for stamping parts products. But we will shorten our lead time according to customers' demands if we are able to.