Metallic Processing Machinery

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Shenzhen Honvision Precision Technology Co., Ltd.
  • After-sales Service:N.a.
  • Warranty:N.a.
  • Condition:New
  • Certification:CE, RoHS, ISO9001, IATF 16949
  • Standard:DIN, ASTM, GOST, GB, JIS, ANSI, BS
  • Customized:Customized

Base Info

  • Model NO.:OEM
  • Material:Aluminum
  • Application:Metal Recycling Machine, Metal Cutting Machine, Metal Processing Machinery Parts, Automobile
  • Precision up to:0.01mm
  • Transport Package:by Sea, by Air, by UPS, DHL, FedEx, EMS
  • Specification:OEM
  • Trademark:HVS
  • Origin:Shenzhen
  • HS Code:7616991090
  • Production Capacity:2000 PCS Per Week

Description

Overview Category
OEM Machining Golf Cart Steering Wheel Adapter Volume Production in ChinaCompany Information

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Workshop

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Equipment

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in ChinaOEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Exhibition

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in ChinaOEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Buyer Feedback

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in ChinaOEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

Packaging & Shipping

OEM Machining Golf Cart Steering Wheel Adapter Volume Production in China

FAQ

Q1:What kinds of information you need for quotation?
VMT: You can provide 2D/3D drawing or send your sample to our factory, then we can make according to your sample.

 

Q2: Can we sign NDA?
VMT: Sure. We'll be very glad to sign NDA with our customers.


Q3: What kind of certification does your company have?
VMT: Our company passed ISO 9001:2015 , IATF 16949: 2016 and etc. 
 

Q4: Do you provide sample?
VMT: Yes, we can provide you sample before mass order.

 

Q5: How can you ensure the quality?
VMT: We have profesional QC department to guarantee the quality.

 

Q6: Delivery time?
VMT: If in Stock: around 3 days after payment. Mass production: around 20~25 days after receipt of deposit (Accurate delivery time depends on specific items and quantities)


Q7: How about the transportation?
VMT: You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.