Metallic Processing Machinery

Roll Forming Machine

Zhangjiagang City Saibo Science & Technology Co., Ltd.
  • Type:Rolling Machine
  • Power Source:Electric
  • Feature:High Efficiency
  • Certification:ISO9001, CE
  • Warranty:12 Months
  • Customized:Customized

Base Info

  • Model NO.:YX23-275
  • Advantage:Use Widely
  • Condition:New
  • Name:Yx41-320-960 Roll Forming Machine
  • Color:Blue and Yellow
  • Transport Package:Sea Packing
  • Trademark:Saibo
  • Origin:Jiangsu
  • HS Code:84552210
  • Production Capacity:300sets,Year

Description

Item NO 
Description 
Offered specification Roll Forming MachineYX23-275 Rolling Speed15-20m/min(not include cutting time) Rolling Thickness0.4-0.6mm G.I Control SystemPLC  (Panasonic) as list in the note Roller StationsAbout 18 stations
According to the actual design plan Roller Material45# forge steel, coated with chrome Shaft Material and DIA¢65mm, material is 45# forge steel Maim Motor Power5.5kw Cutting Way Hydraulic cutting Hydraulic Station Power3kw Hydraulic Pressure12Mpa Material Of CuttingCr12Mov quenching 58-62ºC Tolerance3m+-1.5mm Electric Source380V, 50HZ,3 phase
Also can satisfy customer's require Way Of DriveOne inch single Chain Color Of The MachineYellow and blue Machine TypeWall panel Size of the machineL*W*H   Around 7.0m*1m*1.6m Container Need1 x20 feet
4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation


5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.

 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!